top of page

PO MPPT for 3 MW solar PV system

 

Typically, the P&O method is used for tracking the MPP. In this technique, a minor perturbation is introduced to, cause the power variation of the PV module. The PV output power is periodically measured and compared with the previous power. If the output power increases, the same process is continued otherwise perturbation is reversed. In this algorithm, perturbation is provided to the PV module or the array voltage. The PV module voltage is increased or decreased to check whether the power is increased or decreased. When an increase in voltage leads to an increase in power, this means the operating point of the PV module is on the left of the MPP. Hence further perturbation is required towards the right to reach MPP. Conversely, if an increase in voltage leads to a decrease in power, this means the operating point of the PV module is on the right of the MPP and hence further perturbation towards the left is required to reach MPP.

PO MPPT for 3 MW solar PV system

SKU: 0118
₹3,753.00 Regular Price
₹1,876.50Sale Price

Get 20% Off on Orders above Rs.3500 or 10 % Off

    bottom of page